Cushion Blasting

         When the aim of blasting is to get 1umpy coal or to minimise the formation of coal dust then this blasting is done.in this blasting low density high Explosive are used.                                                                                 In this blasting the hole is first charged with Explosive.The Explosive charge is pushed into the holes followed by one or two piastic air bags.Remaining length of the hole is stemmed by stemming material.in it air bags work as cushion blasting.Such blasting with air gap is known as cushion blasting.

Comments

Mining Engineering

First-aid station

Audio visual alarm

MINE WORKING